Accessibility Improvements

What

Phase 1 of the JWA Facility Accessibility Improvements project includes renovating twelve existing public restrooms in Terminals A and B, installation of two lactation pods, and the introduction of a new adult changing table. The project will also provide accessibility improvements to exterior sidewalks, curbs, pedestrian crosswalks, traffic signals, and ramps to the adjacent streets. 

Where

Restrooms: Terminals A & B, both pre and post-security check-points.

Lactation pods: Arrival (lower) Level, Terminals C & A

Accessibility

  • Airport Way, Arrival (lower) Level, Terminal B
  • Airport Way, Departure (upper) Level, Terminal B
  • MacArthur Blvd through parking garage B2

When

Phase 1A: 3rd Quarter 2024 – 2nd Quarter 2025

Phase 1B: 2nd Quarter 2025 – 4th Quarter 2025